  • According to ISI method of measurement, the order of the sequence is


  • Options
  • A. Length, breadth, height
  • B. Breadth, length, height
  • C. Height, length, breadth
  • D. None of these.

  • Correct Answer
  • Length, breadth, height 


  • Estimating and Costing problems


    Search Results


    • 1. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

    • Options
    • A. breadth of the wall
    • B. half breadth of wall on each side
    • C. one fourth breadth of wall on each side
    • D. None of these.
    • Discuss
    • 2. Pick up the correct statement from the following:

    • Options
    • A. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
    • B. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
    • C. The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
    • D. All the above.
    • Discuss
    • 3. Pick up the incorrect statement from the following:

    • Options
    • A. Dimensions are measured to the nearest 0.01 m
    • B. Areas are measured to the nearest 0.01 sq.m
    • C. Cubic contents are measured to the nearest 0.1 cm m
    • D. Weights are measured to the nearest 0.001 tonnes
    • Discuss
    • 4. The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

    • Options
    • A. (6 + 15) chains
    • B. (6 + 12) chains
    • C. (6 + 18) chains
    • D. None of these.
    • Discuss
    • 5. The value of 'C' of Indian type W.C. shown in the given figure is :

    • Options
    • A. 400 mm
    • B. 450 mm
    • C. 500 mm
    • D. 550 mm
    • Discuss
    • 6. The inspection pit or chamber is a manhole provided in a base drainage system

    • Options
    • A. at every change of direction
    • B. at every change of gradient
    • C. at every 30 m intervals
    • D. at the point where vertical soil pipe joins the house drain
    • E. All the above.
    • Discuss
    • 7. The most reliable estiamte is

    • Options
    • A. Detailed estimate
    • B. Preliminary estimate
    • C. Plinth area estimate
    • D. Cube rate estimate
    • E. None of these.
    • Discuss
    • 8. The measurement is not made in square metres in case of

    • Options
    • A. D.P.C. (Damp proof course)
    • B. Form works
    • C. Concrete Jaffries
    • D. R.C. Chhajja.
    • Discuss
    • 9. The expected out turn of 12 mm plastering with cement mortar is

    • Options
    • A. 2.5 sq m
    • B. 4.0 sq m
    • C. 6.0 sq m
    • D. 8.0 sq m
    • E. 10 sq m
    • Discuss
    • 10. The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is

    • Options
    • A. d x d x s
    • B. d2 x (ds)2
    • C. L.D 1 + s2
    • D. 2 LD 1 + s2
    • Discuss


    Comments

    There are no comments.

Enter a new Comment