CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Estimating and Costing
Comments
Question
The item of the brick structure measured in sq.m, is
Options
A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches.
Correct Answer
Broken glass coping
Estimating and Costing problems
Search Results
1. The order of booking dimensions is
Options
A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Length, breadth, height
2. Pick up the excavation where measurements are made in square metres for payment.
Options
A. Ordinary cuttings up to 1 m
B. surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both (b) and (c)
E. Both (a) and (b)
Show Answer
Scratch Pad
Discuss
Correct Answer: Both (b) and (c)
3. The item of steel work which is measured in sq.m, is
Options
A. Collapsible gates
B. Rolling shutters
C. Steel doors
D. Ventilators and glazing.
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
4. In the mid-section formula
Options
A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two sections
D. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
E. (a), (b) and (c) of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: (a), (b) and (c) of the above.
5. Pick up the incorrect statement regarding a master trap from the following :
Options
A. It is provided in between the lower end of the house drain and the street sewer
B. It is provided a cleaning eye at the top of the trap
C. The height of fresh air inlet pipe fixed vertically with wall is 3 m
D. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
E. The water seal is less than that of ordinary traps.
Show Answer
Scratch Pad
Discuss
Correct Answer: The water seal is less than that of ordinary traps.
6. The expected out turn of 2.5 cm cement concrete floor per manson per day
Options
A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 10 sqm
Show Answer
Scratch Pad
Discuss
Correct Answer: 7.5 sqm
7. The detention period in a septic tank is assumed
Options
A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes
Show Answer
Scratch Pad
Discuss
Correct Answer: 30 minutes
8. Pick up the correct statement in case of water supply.
Options
A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. In laying pipes, the method of jointing and fixing is specifically specified
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
9. The volume is measured correct to the nearest
Options
A. 0.01 cum
B. 0.02 cum
C. 0.03 cum
D. 0.04 cum
E. 0.05 sum
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.01 cum
10. While preparing a detailed estimate
Options
A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to O.Olcum
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering