logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Construction Management Comments

  • Question
  • Construction team means


  • Options
  • A. an engineer
  • B. an architect
  • C. an owner
  • D. a contractor
  • E. all the above.

  • Correct Answer
  • all the above. 


  • Construction Management problems


    Search Results


    • 1. The object of technical planning, is

    • Options
    • A. preparation of specifications
    • B. preparation of estimates
    • C. initiating the procurement action of resources
    • D. taking remedial action for likely bottleneck in the execution
    • E. all the above.
    • Discuss
    • 2. Critical path lies along the activities having total float

    • Options
    • A. positive
    • B. negative
    • C. zero
    • D. same.
    • Discuss
    • 3. Site order book is used for recording

    • Options
    • A. instructions by the executive engineers
    • B. construction measurements
    • C. issue of store equipments
    • D. names of the casual labour.
    • Discuss
    • 4. Completion of an activity on CPM network diagram, is generally known

    • Options
    • A. Event
    • B. Node
    • C. Connector
    • D. All the above.
    • Discuss
    • 5. The time which results in the leasi, possible construction cost of an activity, is known

    • Options
    • A. normal time
    • B. slow time
    • C. crash time
    • D. standard time.
    • Discuss
    • 6. The main principle of an organisation, is

    • Options
    • A. unity of command
    • B. cohegency
    • C. effective control at all levels
    • D. delegation of authority
    • E. all the above.
    • Discuss
    • 7. Henry Gantt developed Bar charts for planning and scheduling of projects in

    • Options
    • A. 1880
    • B. 1900
    • C. 1920
    • D. 1940
    • E. 1950
    • Discuss
    • 8. An Executive Engineer may have powers upto

    • Options
    • A. Rs. 25,000
    • B. Rs. 50,000
    • C. Rs. 100,000
    • D. Rs. 200,000
    • E. Rs. 500,000
    • Discuss
    • 9. CPM is

    • Options
    • A. synthesising in concepts
    • B. is built of activities oriented programme
    • C. is based on time estimate
    • D. is used for repetitive works
    • E. all the above.
    • Discuss
    • 10. Pick up the PERT event from the following:

    • Options
    • A. Digging of foundation started
    • B. Digging of foundation completed
    • C. Laying of concrete started
    • D. Laying of concrete completed
    • E. All the above.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment