Home Civil Engineering Construction Management Comments

  • Question
  • The object of technical planning, is


  • Options
  • A. preparation of specifications
  • B. preparation of estimates
  • C. initiating the procurement action of resources
  • D. taking remedial action for likely bottleneck in the execution
  • E. all the above.

  • Correct Answer
  • all the above. 


  • Construction Management problems


    Search Results


    • 1. Critical path lies along the activities having total float

    • Options
    • A. positive
    • B. negative
    • C. zero
    • D. same.
    • Discuss
    • 2. Site order book is used for recording

    • Options
    • A. instructions by the executive engineers
    • B. construction measurements
    • C. issue of store equipments
    • D. names of the casual labour.
    • Discuss
    • 3. Completion of an activity on CPM network diagram, is generally known

    • Options
    • A. Event
    • B. Node
    • C. Connector
    • D. All the above.
    • Discuss
    • 4. The time which results in the leasi, possible construction cost of an activity, is known

    • Options
    • A. normal time
    • B. slow time
    • C. crash time
    • D. standard time.
    • Discuss
    • 5. Modular co-ordination of construction means proper

    • Options
    • A. planning
    • B. designing
    • C. execution
    • D. all the above.
    • Discuss
    • 6. Construction team means

    • Options
    • A. an engineer
    • B. an architect
    • C. an owner
    • D. a contractor
    • E. all the above.
    • Discuss
    • 7. The main principle of an organisation, is

    • Options
    • A. unity of command
    • B. cohegency
    • C. effective control at all levels
    • D. delegation of authority
    • E. all the above.
    • Discuss
    • 8. Henry Gantt developed Bar charts for planning and scheduling of projects in

    • Options
    • A. 1880
    • B. 1900
    • C. 1920
    • D. 1940
    • E. 1950
    • Discuss
    • 9. An Executive Engineer may have powers upto

    • Options
    • A. Rs. 25,000
    • B. Rs. 50,000
    • C. Rs. 100,000
    • D. Rs. 200,000
    • E. Rs. 500,000
    • Discuss
    • 10. CPM is

    • Options
    • A. synthesising in concepts
    • B. is built of activities oriented programme
    • C. is based on time estimate
    • D. is used for repetitive works
    • E. all the above.
    • Discuss