  • Question
  • Modular co-ordination of construction means proper


  • Options
  • A. planning
  • B. designing
  • C. execution
  • D. all the above.

  • Correct Answer
  • all the above. 


  • Construction Management problems


    Search Results


    • 1. Pick up the incorrect statement from the following:

    • Options
    • A. An activity of a project is denoted by an arrow on the net work
    • B. The tail of the arrow indicates the start of the activity
    • C. The head of the arrow indicates the end of the activity
    • D. The arrows are drawn to scale from left to right
    • E. Each activity consumes a given time.
    • Discuss
    • 2. Coning of wheels

    • Options
    • A. prevent lateral movement of wheels
    • B. provide smooth running of trains
    • C. avoid excessive wear of inner faces of rail
    • D. all the above.
    • Discuss
    • 3. At a rail joint, the ends of adjoining rails, are connected with a pair of fish plates and

    • Options
    • A. 2 fish bolts
    • B. 4 fish bolts
    • C. 6 fish bolts
    • D. 8 fish bolts
    • Discuss
    • 4. A kink is made in stock rails, ahead of the toe of switch at a distance of

    • Options
    • A. 10 cm
    • B. 15 cm
    • C. 20 cm
    • D. 30 cm
    • Discuss
    • 5. For flat bottom sleepers, maximum size of ballast, is

    • Options
    • A. 50 mm
    • B. 40 mm
    • C. 33 mm
    • D. 25 mm
    • E. 20 mm
    • Discuss
    • 6. The time which results in the leasi, possible construction cost of an activity, is known

    • Options
    • A. normal time
    • B. slow time
    • C. crash time
    • D. standard time.
    • Discuss
    • 7. Completion of an activity on CPM network diagram, is generally known

    • Options
    • A. Event
    • B. Node
    • C. Connector
    • D. All the above.
    • Discuss
    • 8. Site order book is used for recording

    • Options
    • A. instructions by the executive engineers
    • B. construction measurements
    • C. issue of store equipments
    • D. names of the casual labour.
    • Discuss
    • 9. Critical path lies along the activities having total float

    • Options
    • A. positive
    • B. negative
    • C. zero
    • D. same.
    • Discuss
    • 10. The object of technical planning, is

    • Options
    • A. preparation of specifications
    • B. preparation of estimates
    • C. initiating the procurement action of resources
    • D. taking remedial action for likely bottleneck in the execution
    • E. all the above.
    • Discuss