CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Construction Management
Comments
Question
Modular co-ordination of construction means proper
Options
A. planning
B. designing
C. execution
D. all the above.
Correct Answer
all the above.
Construction Management problems
Search Results
1. Pick up the incorrect statement from the following:
Options
A. An activity of a project is denoted by an arrow on the net work
B. The tail of the arrow indicates the start of the activity
C. The head of the arrow indicates the end of the activity
D. The arrows are drawn to scale from left to right
E. Each activity consumes a given time.
Show Answer
Scratch Pad
Discuss
Correct Answer: The arrows are drawn to scale from left to right
2. Coning of wheels
Options
A. prevent lateral movement of wheels
B. provide smooth running of trains
C. avoid excessive wear of inner faces of rail
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. At a rail joint, the ends of adjoining rails, are connected with a pair of fish plates and
Options
A. 2 fish bolts
B. 4 fish bolts
C. 6 fish bolts
D. 8 fish bolts
Show Answer
Scratch Pad
Discuss
Correct Answer: 4 fish bolts
4. A kink is made in stock rails, ahead of the toe of switch at a distance of
Options
A. 10 cm
B. 15 cm
C. 20 cm
D. 30 cm
Show Answer
Scratch Pad
Discuss
Correct Answer: 15 cm
5. For flat bottom sleepers, maximum size of ballast, is
Options
A. 50 mm
B. 40 mm
C. 33 mm
D. 25 mm
E. 20 mm
Show Answer
Scratch Pad
Discuss
Correct Answer: 50 mm
6. The time which results in the leasi, possible construction cost of an activity, is known
Options
A. normal time
B. slow time
C. crash time
D. standard time.
Show Answer
Scratch Pad
Discuss
Correct Answer: slow time
7. Completion of an activity on CPM network diagram, is generally known
Options
A. Event
B. Node
C. Connector
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
8. Site order book is used for recording
Options
A. instructions by the executive engineers
B. construction measurements
C. issue of store equipments
D. names of the casual labour.
Show Answer
Scratch Pad
Discuss
Correct Answer: instructions by the executive engineers
9. Critical path lies along the activities having total float
Options
A. positive
B. negative
C. zero
D. same.
Show Answer
Scratch Pad
Discuss
Correct Answer: zero
10. The object of technical planning, is
Options
A. preparation of specifications
B. preparation of estimates
C. initiating the procurement action of resources
D. taking remedial action for likely bottleneck in the execution
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering