When a canal is carried over a natural drainage, the structure provided, is known as
Options
A. syphon
B. aqueduct
C. super passage
D. syphon-aqueduct.
Correct Answer
aqueduct
Irrigation problems
Search Results
1. For designing the venturi head,
Options
A. width of the throat should not be less than one-third of the bed width of main canal
B. width of the throat should not be less than the width obtained from the formula B = Q / 1.2d3/2, where d is the difference in levels of F.S.L. and sill
C. minimum throat width should not be less than 60 cm
D. length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal
2. If L is total length of a canal in kilometres, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is
Correct Answer: A bank in the cross-section of a canal is provided on the left
8. The saturation line is the line up to which banks get saturated after the canal runs for some time. The saturation gradient in ordinary loam soil, is generally