CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
RCC Structures Design
Comments
Question
The amount of reinformcement for main bars in a slab, is based upon
Options
A. minimum bending moment
B. maximum bending moment
C. maximum shear force
D. minimum shear force.
Correct Answer
maximum bending moment
RCC Structures Design problems
Search Results
1. Post tensioning system
Options
A. was widely used in earlier days
B. is not economical and hence not generally used
C. is economical for large spans and is adopted now a days
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
2. The number of treads in a flight is equal to
Options
A. risers in the flight
B. risers plus one
C. risers minus one
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: risers minus one
3. Design of R.C.C. simply supported beams carrying U.D.L. is based on the resultant B.M. at
Options
A. supports
B. mid span
C. every section
D. quarter span.
Show Answer
Scratch Pad
Discuss
Correct Answer: mid span
4. The transverse reinforcements provided at right angles to the main reinforcement
Options
A. distribute the load
B. resist the temperature stresses
C. resist the shrinkage stress
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
5. If the average bending stress is 6 kg/cm
2
for M 150 grade concrete, the length of embedment of a bar of diameter
d
according to I.S. 456 specifications, is
Options
A. 28
d
B. 38
d
C. 48
d
D. 58
d
E. 95
d
Show Answer
Scratch Pad
Discuss
Correct Answer: 58
d
6. The advantage of a concrete pile over a timber pile, is
Options
A. no decay due to termites
B. no restriction on length
C. higher bearing capacity
D. not necessary to cut below the water mark
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
7. The width of the flange of a T-beam should be less than
Options
A. one-third of the effective span of the T-beam
B. distance between the centres of T-beam
C. breadth of the rib plus twelve times the thickness of the slab
D. least of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: least of the above.
8. High strength concrete is used in prestressed member
Options
A. to overcome high bearing stresses developed at the ends
B. to ovecome bursting stresses at the ends
C. to provide high bond stresses
D. to overcome cracks due to shrinkage
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. In a beam the local bond stress
S
b
, is equal to
Options
A.
B.
C.
D.
E. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer:
10. In a combined footing if shear stress exceeds 5 kg/cm
2
, the nominal stirrups provided are:
Options
A. 6 legged
B. 8 legged
C. 10 legged
D. 12 legged
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 12 legged
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering